Skip to content

GM to announce new Michigan investments at Detroit Economic Club

Chevrolet Volt electric drive unit to be built in Warren, Mich. Michigan established as GM’s global center of excellence for vehicle electrification Today at the Detroit Economic Club, General Motors Co. (NYSE: GM) CEO Mary Barra will confirm that the company’s Warren Transmission Plant will build the electric drive unit for the second-generation Chevrolet Volt. … Continued

  • Chevrolet Volt electric drive unit to be built in Warren, Mich.
  • Michigan established as GM’s global center of excellence for vehicle electrification

Today at the Detroit Economic Club, General Motors Co. (NYSE: GM) CEO Mary Barra will confirm that the company’s Warren Transmission Plant will build the electric drive unit for the second-generation Chevrolet Volt. That means most major Volt powertrain components – from its battery cells to its range-extender – will be made in Michigan, establishing the state as the company’s global engineering center of excellence for vehicle electrification.

At the same time, Barra will announce capital investments of nearly $300 million in Michigan between now and the end of the year. Details will be announced later.

“We must provide the breakthrough technology that our customers want,” said Barra. “Our investments in the Chevy Volt and Michigan signify our commitment to lead the industry in technology and innovation.”

Since 2009, GM has announced more than $11 billion in investments in the United States, with almost half of that investment committed to Michigan.

In addition, GM has worked with its UAW partners to develop initiatives that will lead to more than 22,600 jobs in the United States. This hiring has begun and will continue over the next few years, and many of these jobs will be based in Michigan.

General Motors has invested approximately $1.82 billion since 2009 in capital dedicated specifically to vehicle electrification in Michigan
General Motors has invested approximately $1.82 billion since 2009 in capital dedicated specifically to vehicle electrification in Michigan

Approximately $1.82 billion in capital has been invested in projects dedicated specifically to vehicle electrification.

  • GM’s Brownstown Township facility is the country’s first high-volume lithium-ion battery pack manufacturing site operated by a major automaker.
  • The Chevrolet Volt and Cadillac ELR are assembled at GM’s Detroit-Hamtramck assembly plant.
  • GM’s Flint Engine Operations will build the 1.5-liter, four-cylinder range extender for the Volt. The unit is part of an all-new engine family.
  • Warren Transmission will build the GM Voltec 4ET50 Multi-Mode Electric Drive Unit, which allows the Volt to drive in pure electric or extended range electric mode.

Battery cells for the Volt and ELR are produced by LG Chem in Holland, Mich., and the Volt’s vehicle’s electric motors will also be made in the United States.

Within the first year of production, about 70 percent of the Volt’s parts will be made in the United States or Canada, which GM believes is the most for a plug-in or conventional hybrid.

Welcome back , to continue browsing the site, please click here